Transportation

  • Financial Consultant for Construction of 7 Nos of Standalone safety structures/works at different locations on various NHs in the state of Maharashtra on EPC Mode
  • Financial Consultant for Strengthening and Major Maintenance of “Four Lane divided carriageway Road with paved shoulders configuration from Km. 205.00 to Km. 278+685 of NH-37 in the State of Assam” on PBMC Mode.
  • Financial Consultant for Maintenance of Hathikali to Narimbangalo section of NH-54E from KM 83+400 to Km 140+700 (new NH-27) in the State of Assam on Performance Based Maintenance Contract (PBMC) Mode
  • Construction of 4-lane Highway of Armoor – Jagtiyal – Mancherial Section of NH-63 from Medpally (design km. 65.000) to Jagtiyal (design km. 93.700) (total length 28.700 km) under NH (O), on HAM in the State of Telangana (Pkg-II)
  • Maintenance works and activities on section from Vadodara to Bharuch (km. 108.700 to 192.000) of [NH No. 48] in the State of Gujarat on EPC mode
  • Construction of 2L+PS Bypass for Muvattupuzha Town from Km 33.97 to Km 38.20 of NH-85 (Existing Kochi – Munnar road) in the State of Kerala on EPC mode under NH (O) Scheme
  • Rehabilitation and up-gradation of NH-43 (New NH-30) from Dhamtari – Kanker (Km. 81.500 to 130.00), Bedma – Dahikonga (Km. 180.000 to Km. 241.000) and Dahikonga – Jagdalpur (Km. 241.000 to Km. 298.000) section to 2-lanes with paved shoulders in the state of Chhattisgarh under NHDP – IV through EPC mode.
  • Financial Consultancy Services Development of Six-Lane Access Controlled Greenfield Highway from Audireddipalle (Ch. 160+000) to Mallapalle (Ch. 176+000) of [NH-544G] Bengaluru – Vijayawada Economic Corridor on HAM Mode under Bharatmala Pariyojana Phase – I in the State of Andhra Pradesh (Package – 07)
  • DPR preparation of Kharagpur – Bardhhaman-Moregram section of Economic Corridor under the development of Economic Corridor inter corridor Feeder Routes and Costal Roads to improve the efficiency of freight movement in India (Lot/West Bengal/Package – 1) – Package – 1 from km 0.00 to km 41.00/HAM
  • Permanent rectification of 3 nos. of black spot in project Highway NH-27 of U.P. border – Dewapur – Kotwa section from km. 360.915 to km. 440.000 (total length of 79.085 km) of NH-27 (old NH-28) in the state of Bihar & permanent rectification of 5 nos. of black spots of project Highway NH-27 of Kotwa – Mehsi – Muzaffarpur Section from km 440.00 to km 520.00 (Total Length 80.00 Km) of NH-27 (old NH-28) in the State of Bihar on EPC mode
  • 4- Laning of Jagtial Karimnagar Section of NH – 563 from Design Ch. 0.000 km (Existing chainage 90/500 on NH-63) to Design Ch. 58.866 km (near Sh-1 Ch. 170.400 km) at Karimnagar Bypass End (Design Length 58.866km) in the State of Telangana on Hybrid Annuity Mode under Bharatmala.
  • Financial Consultancy Services for Construction of New Double Tier 4 – Lane Elevated Corridor from Chennai Port to Maduravoyal in Chennai District from km – 0+342 to Km 20+223 on EPC Mode under Bharatmala Pariyojana in the State of Tamil Nadu – Package – III (Km 9+700 to Km 14+185)
  • Construction of 6-lane Greenfield Karnal Ring Road Starting from NH-44 near Village Shamgarh (Design km 0+000) and terminating at Karnal – Munak Road (MDR – 115) near Village Samalakha (Design km 34+500) under Bharatmala Pariyojnana in in the State of Haryana on Hybrid Annuity Mode
  • Conversion of Partially Excavated Escape Tunnel to Uni- Directional 2 Lane Tunnel (Length – 1.80 Km0 from Km 12+732 to Km 14+568 of NH – 21 including construction of  cross passages and approach roads on either side of the tunnel on Kiratpur to Nerchowk section of NH- 21 in the State of Himachal Pradesh on EPC Mode
  • 4/6 Laning of Marutha road – Karimba section (length=30.72Km) of NH 966 in the state of Kerala under HAM
  • Four Laning of NH 530B from Gaju Village (Design km 32.982) to Devinagar Bypass (End) (Existing Km. 208.000 of SH 33/Design Km. 66.000) (Design length = 33.018 km) [Package – 1C] in the State of Uttar Pradesh on HAM Mode
  • 4 – Laning of Ujjain – Badnawar Section of SH-18 from Km 29.6 to km 96.00 (Length – 69.1km) in the State of Madhya Pradesh of Hybrid Annuity Mode
  • Improvement of Geometrics (6-Laning) from Km 22.30 to Km 34.14 on Hyderabad – Bengalore Section of NH-44 (old NH-7) in the State of Telangana on EPC Mode
  • Four Laning of Miraj City Portion Length in Miraj – Solapur Section of NH – 166 from Km 189.300 to Km 200.100 Design Length 10.800 Km in the State of Maharashtra on EPC Mode
  • Six laning of Aurangabad to Bihar – Jharkhand Border (Chordaha), Section of NH-2 from 209+827 to km. 249.525 (PKG-II) in the State of Bihar under Bharatmala on EPC Mode.
  • Financial Consultancy Services for Development of Memmadpur (Ambala) – Banur (IT City Chowk) – Kharar (Chandigarh) Corridor under Bharatpur Pariyojana – Package – I – 6 laning of Ambala – Chandigarh greenfield with spur to Lalru (4 lane) & spur to PR-7 road in the State of Punjab on Hybrid Annuity Mode (Design Ch. 0+000 to 25+000, Spur to Lalru – Design Ch. 0+000 to 5+786, Spur to PR-7 road – Design Ch. 0+000 to 11+157, Total Length 41,943 Kms)
  • Financial Consultant for 4 laning of Missing link of NH-39 (13km) and completion of ring road of Rewa town on EPC Mode.
  • Financial Consultancy Services for Construction of Four Laning Greenfield Road Connecting North and South Industrial Cluster of Khandaleru Creek Krishnapatnam Port at Thamminapatnam to Mollur Near Muthukur (Part-1) (Ch 0+000 to Ch 16+041) and (Part-2) extension of Dedicated port Road on NH-67 from (Ch18+000 to 19+300) in State of Andhra Pradesh on EPC mode under Bharatmala Scheme
  • Financial Consultancy Services for “Construction of 6 laning from Belgaum to Sankeshwar Bypass from km 515+000 to km. 555+017 of NH-48 in the State of Karnataka on DBFOT mode under Bharatmala Pariyojna Package
  • Construction of four – lane Greenfield Delhi – Amritsar – Katra Expressway from Junction with Amritsar – Jalandhar road (NH-3) near Bhishambarpura to Junction with Amrtisar – Ajnala road (NH-354) near Amritsar Airport (km 71+00 to km 99+000 of Amritsar Connectivity) under Bharatmala Pariyojana in the State of Punjab on EPC Mode.
  • Construction of 6 – lane Grade Separator Structure at Km 36.530 in Hazaribagh Bypass of NH-33 (Junction with NH-100) in the State of Jharkhand on EPC Mode
  • Construction of 6 lane flyover with service road (Both side) at km. 417.480 and 6 lane VUP with service road (Both side) at km. 430+625 on Jalandhar – Amritsar Section of NH-03 (Old NH-01) in the state of Punjab on EPC Mode.
  • Financial Consultancy Services for 4 lanning of Missing Link between Nari (Vartej) to Budhel Chowkdi (Bhavnagar Bypass) section of NH-51 including Flyover at Nari circle and its approaches to be take up on EPC mode
  • Construction of 6 – lane access controlled Greenfield highway from km 67+000 to km 99+000 of Rajasthan/Gujarat Border to Santalpur Section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Gujarat on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/RGBS-Package-3)
  • Construction of Additional Structures under Six Laning of Delhi – Agra section of National Highway no. 2 (New NH-19) in the state of Uttar Pradesh between Km 143.00 and 195.10 on EPC Mode.
  • Financial Consultant for 6-Laning with access control from km 29,435 to km 74,168 of Neelmangala – Tumkur section of NH-4 in the State of Karnataka under Bharatmala Pariyojna on DBFOT mode
  • Financial Consultant for Six Laning of Gurgaon – Jaipur Section of NH-8 from km 42.700 to km 273.00 (Length 225.60 km) in the states of Haryana & Rajasthan to be executed as BOT (Toll) on DBFO pattern under NHDP Phase-IV for additional structures on EPC mode
  • Financial Consultant for the Construction of Eight Lane access-controlled expressway from Baletiya village of Panchmahal district to Nani Bhadol village of Vadodara district (Ch. 803+420 to 823+420 design Ch. 351+000 to Ch. 371+000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in the State of Gujarat
  • Financial Consultant for four Laning of Greenfield Alignment from Km 0.000 (Tallampadu) to Km 44.937 (Ramanujavaram) (Design length= 44.937 Km) in the State of Telangana under Bharatmala Pariyojana (Inter Corridor Route) (Package-I) on EPC mode.
  • Financial Consultant for Four Laning of Mamallapuram  to Mugaiyur Section of NH-332A from Km. 0.000 to Km 31.000 (Design Chainage) under Bharatmala Pariyojana Phase-I (Feeder Routes) in the State of Tamil Nadu  on Design, Build. Finance, Operate and Transfer (the “DBFOT”) basis.
  • Financial Consultant for Construction of Eight Lane access-controlled Expressway carriageway from Bawadi village (Near Shivgarh) of Ratlam district to Ranni Village of Jhabua district (Ch. 627+420 to 652+720; design Ch. 175+000 to 200+300) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in the State of Madhya Pradesh
  • Financial Consultant for Construction of Eight Lane access-controlled Expressway Carriageway from Kandarwasa village to Bawadi village (Near Shivgarh) of Ratlam district (Ch. 602+420; design Ch. 150+000 to Ch. 175+000) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in the State of Madhya Pradesh
  • Financial Consultant for 4 Laning of NH-80 Design Km 215.000 to 257.718 (existing Km 215.000 to Km 260.000) of the section from Mirza Chauki to Farakha (km 190.000 to km 283.000) in the state of Jharkhand on Hybrid Annuity Mode
  • Four laning of Sinnar to Shirdi section of NH-160 from Design ch: 0/000 to 50/943 (including Sinnar Bypass) in the state of Maharashtra on Hybrid Annuity Mode
  • Construction and upgradation of NH – 131Afrom Km 34.600(design Ch: 6.000) near Narenpur to Km 79.970(design Ch: 53.000) near Purnea to 4 lane standard and from Km 79.970 (design Ch: 53.000) to Km 82.000 (design Ch: 55.000) near Purnea to 2 lane with paved Shoulders standard in the State of Bihar on Hybrid Annuity Mode
  • Financial Consultant for Balance Works for Four Laning of Rargaon – Jamshedpur Section of NH-33 from Km 217.300 to Km 233.350 (16.050 Km length) in the State of Jharkhand under NHDP-III on EPC (item rate) Mode (Package-III)
  • Financial Consultant for Construction of Elevated Structure including Approaches from Km. 352+675 to Km 354+430 and VUP at Km 335+400 including approaches on NH-44 (Old NH-1) at Phagwara city in the state of Punjab on EPC mode as Standalone project
  • Financial Consultant for Four Laning of Chettikulam to Natham Section of NH-785 from Km 7.040 to Km. 36.430 (Design Length 29.390) in the State of Tamil Nadu on EPC Mode under Bharatmala Paryojna Phase-I
  • Construction/Up-gradation of Two lane with paved shoulder of NH-70 from Munabao (NH-25E) - Sundra – Myajlar - Dhanana – Asutar – Ghotaru – Tanot [Design Chainage Km 0.000 to Km 46.000 & Km 82.600 to Km 310.467] under Phase-1 of Bharatmala Pariyojana (Total Length 273.867 Km) on Hybrid Annuity Mode (HAM) in the State of Rajasthan
  • Upgradation to 2 lane with paved shoulder/4 lane of Khajuwala - Poogal section (Design Chainage 0+000 to 30+812) and Poogal- Dantour- Jaggasar - Gokul - Goddu - Ranjeetpura- Charanwala - Naukh - Bap section of NH-911 (Design Chainage 1+430 to 182+725) (Total length 212.107 km) under Bharatmala Pariyojna in the state of Rajasthan on Hybrid Annuity Mode.
  • Four laning of Ahmedanagar – Mirajgaon – Karmala – Tembhurni section of NH – 561A (Package – I) from Ahmednagar to Ghogargaon (from design Ch 0+000 to CH 38+775) in the State of Maharashtra under Bharatmala Pariyojana on Hybrid Annuity Mode
  • Financial Consultant for Rehabilitation and upgradation of Jhajjar – Loharu Section from km 130.770 to km 228.630 (Design Chainage km 0.000 to km 97.864) of NH-334B in the State of Haryana on EPC basis under NH (O) – Part 1 as 2-lane with paved shoulder
  • Financial Consultant for Construction of 4 – lane Existing Road from Km 169/6 to Km 173/6 (Mohana Town Portion) Gwalior – Shivpuri Section of NH – 3 (Length 4.0 Km) in the State of Madhya Pradesh on EPC Mode
  • Financial Consultant for Construction of flyover in Sakoli on NH – 53 (old NH-06) in the State of Maharashtra on EPC mode
  • 4 Laning of Belgaum – Khanapur Section Km 0+000 – Km 30+800 ( design chainage Km 0+000 - Km 30+000) of NH-4A in the State of Karnataka on Hybrid Annuity Mode
  • Rehabilitation and Up-gradation of 4 lane to 6 lane of Bhadrak – Baleshwar section of NH-5 (New NH-16) from Km. 136.500 to Km. 199.141 in the State of Odisha to be executed as Hybrid Annuity mode under NHDP Phase-V (Pkg.-II)
  • Construction of new tunnel at Khambatki Ghat section of NH-4 and its approaches from existing Km 771.730 to existing Km 782.000 in the State of Maharashtra on EPC mode
  • Financial Consultant for Balance work for Four Laning of Bhopal- Biaora Section of NH-12 from km 324.00 to km. 423.400 in the State of Madhya Pradesh (Package –II) on EPC mode.
  • Financial Consultant for Four Lanning of Sangareddy – Nanded – Akola Section of NH – 161 in the State of Telangana (Pkg –I) on EPC mode.
  • Financial Consultant for 6-Laning of Handia Varanasi section of NH-2 from Km 713.146 to km 785.544 in the State of Uttar Pradesh under NHDP Phase-V on Hybrid Annuity Mode.
  • Financial Consultant for Four/ Six Laning of Ludhiana-Chandigarh Section of NH–21 and NH – 95 in the State of Punjab under NHDP Phase–V (the “Project”) Through Public – Private Partnership (PPP) on Design, Build. Finance, Operate and Transfer (the “DBFOT”) basis.
  • Financial Consultant for Four laning of Talaja – Mahuva section of NH-8E from Km. 53.585 to Km. 100.100 (Design Chainage from Km. 54.990 to Km. 100.450) (Package –II) in the State of Gujarat on Hybrid Annuity Mode under NHDP Phase IV.
  • Financial Consultant for Four/Six laning of Kharar – Ludhiana Section of NH-95 (new NH-05) from Kharar Km 10+185 (Design Chainage) to Samrala Chowk Ludhiana Km 86+199 (Design Chainage in the State of Punjab on Hybrid Annuity Mode
  • Financial Consultant for Development of Delhi – Meerut Expressway from Km 0.000 to Km 27.500  including 6/8 Laning of NH – 24 from Km. 0.000 to Km. 49.346 (Hapur Bypass) in the State of Delhi and Uttar Pradesh - Package I from km 0.000 to existing km 8.360  in the State of Delhi  - on Hybrid Annuity Mode
  • Financial Consultant for Development of Delhi – Meerut Expressway from Km 0.000 to Km 27.500 including 6/8 Laning of NH – 24 from Km. 0.000 to Km. 49.346 (Hapur Bypass) in the State of Delhi and Uttar Pradesh Package – III Six Laning from existing Km. 27.740 to existing Km. 49.346 (Dasna to Hapur) in the State of Uttar Pradesh on Hybrid Annuity Mode.
  • Financial Consultant for 4-Laning of Rampur – Kathgodam Section of NH-87 (New NH No. 9) from Km. 0.000 (Km. 190.000 of NH–24) to Km. 42.791 (Design Chainage tala Km. 43.446) in the State of Uttar Pradesh Under NHDP Phase – III on Hybrid Annuity mode.
  • Financial Consultant for “ Four Laning of Rewa – Katni – Jabalpur of NH – 7 (from km 311+000 to km 359+500 and from km 378+500 to km 397+000) (Package – II) in the State of Madhya Pradesh under NHDP Phase – IV on Engineering, Procurement and Construction (EPC) mode”
  • Financial Consultant for “Rehabilitation and up gradation to 2 lane with paved shoulder configuration of existing 2 lane road of Dahod to Padhi section of NH 113 in the state of Rajasthan & Gujarat under NHDP – IVB on EPC basis 412.00) (Length 62.160 km) in the State of Rajasthan under NHDP Phase IV on EPC basis Project”
  • Financial Consultant for Six Laning of Agra – Etawah Bypass Section of NH-2 (From Km 199.660 to Km 323.525 in the State of Uttar Pradesh under NHDP Phase-V BOT
  • Financial Consultant for “2- lane to 6 – laning of Jalandhar – Amritsar Section of NH -1 from km 387.100 to km 407.100 (20 km) in the State of Punjab under NHDP Phase – II”, EPC Project
  • Financial Consultant for “Six Laning of Aurangabad – Barwa Adda Bypass Section of NH – 2 from km (180.00 to km 398.750) under NHDP Phase –V in the State of Bihar to be executed a BOT (Toll) Project on DBFOT Pattern 
  • Financial Consultant for Bid Evaluation of four laning of Jabalpur-Katni-Rewa Section of NH-7 from Km 242+300 to Km 465+500 (including Katni Bypass) on BOT basis on DBFOT under NHDP-IV in the State of Madhya Pradesh.
  • Financial Consultant for “Four Laning of Krishnagar – Baharampore section of NH – 34 from Km 115.000 to Km 193.000 in the State of West Bengal under NHDP Phase III on DBFOT (Annuity) Basis”
  • Financial Consultant for “Four Laning of Barasat – Krishnagar section of NH-34 from Km. 31.000 to Km. 115.000 in the State of West Bengal under NHDP Phase – III on DBFOT (Annuity) Pattern Project.”
  • Financial Consultant for “Two-laning with paved shoulder of Bhopal – Sanchi Section of NH-86 Ext. from km 0.000 (Misrodh Junction) to km 53.775 in the State of Madhya Pradesh under NHDP phase III on BOT (Annuity) on DBFOT pattern”
  • Financial Consultant for “Development of NH-59 (from km 9.500 to km 171.100) in the State of Madhya Pradesh under NHDP Phase III on build, Finance, Operate and Transfer (DBFOT) basis of Indore, MP Border to Jhabua, Gujarat Border Section.”
  • Financial Consultant for “Rehabilitation, Strengthening and four laning of Quazigund to Banihal section of NH-1A from km 189.350 to km 204.700, including 2 – tunnels (2lane) of 0.69 Km & 8.45 Km length, on DBFOT (Annuity) basis, in the State of Jammu and Kashmir
  • Financial Consultant for “ Four Laning of Amritsar – Pathankot Section of NH-15 from Km 6.082 to Km 108.502 (Total Length 102.420 Kms) in the State of Punjab on BOT basis under NHDP IIIB”
  • Financial Consultant for “Design, Engineering, Construction, Development, Finance, Operation and Maintenance Four Laning of Jorbat – Shillong (Barapani) Section of NH-40 from km 0.000 to Km. 61.800 of NH – 40 in the State of Assam and Meghalaya under SARDP – NE on Build, Operator and Transfer (BOT) (Annuity) Basis”
  • Financial Consultant for “Two Laning of Shillong Bypass connecting NH-40 and NH-44 from km 61.800 of NH-40 to Km 34.850 of NH-44 in the State of Meghalaya on DBFOT on Annuity basis”
  • Financial Consultant for “Four – laning of Ranchi Rargaon Jamshedpur section from km 114.000 to km 277.500 of NH – 33 in the State of Jharkhand on Design, Build, Finance, Operate and Transfer (DBFOT) Annuity basis under NHDP Phase – III Project”
  • Financial Consultant for “Four Laning of Barhi – Hazari Bagh Section of NH – 33 from km 0.000 to km 40.50 in the State of Jharkhand on DBFOT (Toll) basis under NHDP – Phase III”
  • Financial Consultant for “Six laning of Chilakaluripet – Nellore Section of NH – 5 from km 1182.802 to km 1366.547 (length – 183.620 Km) in the State of Andhra Pradesh under NHDP Phase–V to be executed as BOT (Toll) Project on DBFOT Pattern”
  • Financial Consultant for “Six Laning of Krishnagiri – Walajahpet section of NH – 46 from km 0/0 to km 148/300 (length 148.30 km) in the State of Tamil Nadu under NHDP Phase – V to be executed as BOT (Toll) project on DBFO Pattern”
  • Financial Consultant for Designing, Engineering, Financing, Procurement, Construction, Operation and Maintenance of 4 Laning of Belgaum-Goa/Karnataka Border section (km 0 to km84) of NH-4A in the State of Karnataka on BOT (Toll) / BOT (Annuity) Projects under NHDP Phase–III.

Have any question?

We're here to help. Send us an email or call us.

Contact Us
pokemontoto pokemontoto pokemontoto pokemontoto pokemontoto pokemontoto pokemontoto pokemontoto pokemontoto pokemontoto rtp live sahamtoto sahamtoto sahamtoto sahamtoto sahamtoto sahamtoto sahamtoto sahamtoto sahamtoto sahamtoto taysentoto taysentoto taysentoto taysentoto taysentoto taysentoto taysentoto taysentoto taysentoto taysentoto morfintoto morfintoto morfintoto morfintoto morfintoto